Customer Requirements for Integrated System Design and Easy Operation
4WD/Motorhome/Caravan
Customer Requirements for Integrated System Design and Easy Operation
Confidential and Proprietary and subject to Copyright
- Broad understanding of lifestyle/travel goals
- How many days a year will you use?
- How electric do you want to be?
- How many days of “camping” with no driving?
- How many hours driving between camps?
- How many hours driving per day in general when not camping?
- Will you be operating caravan as base and vehicle for off-road excursions?
- Broad Understanding of replenishment capability
- What size alternator in Amps at what Voltage?
- What roof area available for Solar in mm Long x mm Wide to nearest mm.
- Detailed Understanding of Loads
- List of 240V/110V Loads
- Do you want electric hot water?
- How long do you want to run the aircon?
- List of DC Loads
- How would you describe your energy use:
- Frugal, Moderate, Bold, Super Bold
- Energy Analysis
- Safiery provide analysis of replenishment energy by solar days
TOP 20%, middle 60%, bottom 20% - Replenishment Ability in "Data picture"
- Safiery provide analysis of replenishment energy by solar days
- Digital Switching
- IP Cameras required? Want to see on-line remotely?
- Fusion Sound system? Want to integrate with streaming multi-media?
- Thoughts on outputs to switch?
- Thoughts on automation?
- Internet Connectivity
- 4G or Starlink?
- Streaming media?
- Size and Space required for board
- X, Y and Z dimensions
- Multiple locations permissible
- Location of display??
- Quotation for system
- Safiery use an “open book” on pricing. Our policy of published retail pricing is used.
- Design and Engineering is “included” at no extra charge in our standard process; this is the big value added. Do it once, do it right. 5 years Warranty Victron / Lithium.
- Variations and changes after consultation
- Build Process
- Digital Twin on digital white board. Want to watch the process on-line?
- Design freeze date
- Pre-commissioning
- Testing & Compliance Check
- Compliance certificate issued
- Video of final build published
- Minor Changes embraced
- Commissioning. Test and Video
- Bring up on-line from Coomera
- Check safety systems
- Run for testing
- Review on-line
- System is always on-line with Internet. Report after 7/10 days of first use
- Gold Support Option Kicks in after 30days