Customer Requirements for Integrated System Design and Easy Operation

4WD/Motorhome/Caravan

Customer Requirements for Integrated System Design and Easy Operation

Confidential and Proprietary and subject to Copyright

  1. Broad understanding of lifestyle/travel goals
    • How many days a year will you use?
    • How electric do you want to be?
    • How many days of “camping” with no driving?
    • How many hours driving between camps?
    • How many hours driving per day in general when not camping?
    • Will you be operating caravan as base and vehicle for off-road excursions?
  2. Broad Understanding of replenishment capability
    • What size alternator in Amps at what Voltage?
    • What roof area available for Solar in mm Long x mm Wide to nearest mm.
  3. Detailed Understanding of Loads
    • List of 240V/110V Loads
    • Do you want electric hot water?
    • How long do you want to run the aircon?
    • List of DC Loads
    • How would you describe your energy use:
      • Frugal, Moderate, Bold, Super Bold
  4. Energy Analysis
    • Safiery provide analysis of replenishment energy by solar days
      TOP 20%, middle 60%, bottom 20%
    • Replenishment Ability in "Data picture"
  5. Digital Switching
    • IP Cameras required? Want to see on-line remotely?
    • Fusion Sound system? Want to integrate with streaming multi-media?
    • Thoughts on outputs to switch?
    • Thoughts on automation?
  6. Internet Connectivity
    • 4G or Starlink?
    • Streaming media?
  7. Size and Space required for board
    • X, Y and Z dimensions
    • Multiple locations permissible
    • Location of display??
  8. Quotation for system
    • Safiery use an “open book” on pricing. Our policy of published retail pricing is used.
    • Design and Engineering is “included” at no extra charge in our standard process; this is the big value added. Do it once, do it right. 5 years Warranty Victron / Lithium.
    • Variations and changes after consultation
  9. Build Process
    • Digital Twin on digital white board. Want to watch the process on-line?
    • Design freeze date
    • Pre-commissioning
    • Testing & Compliance Check
    • Compliance certificate issued
  10. Video of final build published
    • Minor Changes embraced
  11. Commissioning. Test and Video
    • Bring up on-line from Coomera
    • Check safety systems
    • Run for testing
  12. Review on-line
    • System is always on-line with Internet. Report after 7/10 days of first use
    • Gold Support Option Kicks in after 30days